Urja Developers

Urja Developers Pvt. Ltd. (Urja), is the rising brand in the Nepal power sector.

2017 2018 2020 2019 Dudhkoshi - 9 / Mai Beni / Lower Jogmai Middle Mewa / Tamakoshi-9 / Palun Khola Siwa Khola 166 MW 260 MW 341 MW Upper Myagdi 314 MW

Cumulative Installed Capacity of the Hydropower Projects under Urja


Incorporated in June 2016 AD under the Company Act of Nepal, Urja has been able to establish a portfolio of hydropower projects with a cumulative installed capacity of over 375 MW. These projects are in various phases of development: some are in the feasibility study phase, some in the construction stages. Urja envisions harnessing 1 GW (1000 MW) hydropower potential in the country by 2030 AD; coherent with the plan and policy of the Government of Nepal.

The sustainable development of immense hydropower potential in the country is seen as the engine for Nepal's economic prosperity. This is possible through serving rising electricity demand in the domestic market and by securing a key role in ensuring appropriate generation mix towards regional energy security in South Asia. Urja has core competence that aims to provide sustainable solutions through innovation and value engineering to the whole gamut of issues with a lucid understanding of the life cycle of the hydropower development while addressing social management and environmental challenges in a complex project implementation milieu.

Urja's core competencies include the resource and technical capability, institutional setup, and competent human resources to provide complete integrated solutions for the implementation of hydropower projects at the shortest possible time while maintaining the highest quality ..

More About Us
Our Projects
Mai Beni Hydropower Project - 9.51 MW

Located in the middle reach of Mai river in Ilam district of eastern part of Nepal, Mai Beni Hydropower Project is a Run-of-River type hydropower project with an installed capacity of 9.51 MW. The Project is the pilot project of Urja Developers Pvt. Ltd. The components of the project lie between an ..

Read More
Lower Jogmai Khola Hydropower Project - 6.2 MW

Lower Jogmai Khola Hydropower Project is a simple Run-of-River type hydropower project located in Ilam District of eastern Nepal. The project lies at the end reach of Jogmai River within close proximity of Mai Beni Hydropower Project, where the river meets the Mai river. The Installed Capacity of th..

Read More
Middle Mewa Hydropower Project - 73.5 MW

Located at a distance of 700 Km northeast of Kathmandu, Middle Mewa HPP is one of the very few Peaking Run of River (PROR) type projects in Nepal. The project is proposed in Mewa river in the Taplejung District, Province-1 of eastern Nepal. The headworks is located just downstream of the confluence ..

Read More
Siwa Khola Hydropower Project - 9.3 MW

Located at a distance of 730 km north-east of Kathmandu, Siwa Khola HPP is one of the very few Peaking Run of River (PROR) type projects in Nepal. The project is proposed in Siwa river in Taplejung District, Province-1 of eastern Nepal. The headworks is proposed on the left bank of Siwa ri..

Read More
Dudhkoshi-9 Hydropower Project - 166 MW

Dudhkoshi – 9 Hydropower Project lies in the middle reaches of the Dudhkoshi River, which originates from the Himalayas. The project components are located at Solukhumbu District, Nepal between elevations of 2762 m and 2352 m above mean sea level, resulting in a gross head of about 410m. The I..

Read More

View All The Projects

Board of Directors
MR. BIJAY BAHADUR RAJBHANDARY
Chairman
MR. BHANU POKHAREL
Managing Director
MR. MOHAN DAS MANANDHAR
Director


Meet our Board of Directors composed of pioneering leaders involved in the construction and renewable energy industry for over the past 30 years.

Urja Group of Companies


Send An Email Give Us a Call