Our Projects
Mai Beni Hydropower Project - 9.51 MW

Located in the middle reach of Mai river in Ilam district of eastern part of Nepal, Mai Beni Hydropower Project is a Run-of-River type hydropower project with an installed capacity of 9.51 MW. The Project is the pilot project of Urja Developers Pvt. Ltd., and has embarked on construction since May 2..

Read More
Lower Jogmai Khola Hydropower Project - 6.2 MW

Lower Jogmai Khola Hydropower Project is a simple Run-of-River type hydropower project located in Ilam District of eastern Nepal. The project lies at the end reach of Jogmai River within close proximity of Mai Beni Hydropower Project, where the river meets the Mai river. The Installed Capacity of th..

Read More
Middle Mewa Hydropower Project - 49 MW

Located at a distance of 700 Km northeast of Kathmandu, Middle Mewa Hydropower project is one of the very few Peaking Run of River type projects in Nepal. The project is proposed in Mewa river in Taplejung District of eastern Nepal. The project shall utilize the design discharge of 12.56 m3/s to gen..

Read More
Palun Khola Hydropower Project - 21 MW

Palun Khola Small Hydropower Project is a 21 MW capacity project in the end stretch of Palun River, the major tributary of Mewa River. The project lies in Taplejung District, a few kilometers upstream of Middle Mewa Hydropower project. The project complements the concept of Cascade and Corridor visi..

Read More
Dudhkoshi-9 Hydropower Project - 111 MW

Dudhkoshi – 9 Hydropower Project lies in the middle reaches of Dudhkoshi river, which originates from the Himalayas. The project components are located at Solukhumbu District, Nepal between elevations of 2650 m and 2350 m above mean sea level, resulting in a gross head of about 300m. The Insta..

Read More
Tamakoshi-9 Hydropower Project - 24.46 MW

The project lies in the upper reaches of Tamakoshi river in Dolakha District of Nepal. The entire project components are located along the right bank of Tamakoshi River between elevation of 2165 m and 2000 m above mean sea level. The gross head of the project is 162 m, the design discharge is 20.25 ..

Read More
Upper Myagdi - I Hydropower Project - 53.5 MW

The project lies in the Myagdi river located at Myagdi District of Nepal. The entire project components are located along the left bank of Myagdi River between elevation of 1355 m and 1160m above mean sea level. The project is about 320 km road distance from Kathmandu, the capital city of Nepal. The..

Read More
Siwa Khola Hydropower Project - 26.86 MW

Located at a distance of 700 Km northeast of Kathmandu, Siwa Khola Hydropower project is proposed in Siwa river in Taplejung District of eastern Nepal. The project shall utilize the design discharge of 5.49 m3/s to generate 26.86 MW of electricity. The project is accessible through a 32 km of a..

Read More