Dudhkoshi-9 Hydropower Project - 166 MW

Project Developed By
Salient Features

•    Installed Capacity: 166 MW
•    Project Location: Khumbu-Pasang Lhamu Rural Municipality, Solukhumbu District, Province-1
•    Types of Scheme: Run of River (RoR)
•    Gross Head: 410 m
•    Net Rated Head: 394.25 m
•    Design Discharge (at 40.8 % PoE): 47.6 m3/s
•    Net Annual Energy: 964.77 GWh
•    Headrace Tunnel: 8580 m
•    Power Evacuation to: Proposed Tingla Substation (40 km from Powerhouse)

Project Brief

Dudhkoshi – 9 Hydropower Project lies in the middle reaches of the Dudhkoshi River, which originates from the Himalayas. The project components are located at Solukhumbu District, Nepal between elevations of 2762 m and 2352 m above mean sea level, resulting in a gross head of about 410m. The Installed Capacity of the project is 166 MW utilizing a discharge of 47.60 m3/s. The feasibility study of the project has been completed. At present, approval procedure for conducting the Environmental Impact Assessment has been initiated. 