Salient Features
  • Installed capacity: 26.86 MW
  • Project Location: Mikhwa Khola & Meringden Rural Municipality, Taplejung district, Province - 1
  • Type of Scheme: Run-of-River (RoR)
  • Gross Head: 582.50 m
  • Net Rated Head: 568.08 m
  • Design Discharge: 5.49 m3/s
  • Net Annual Energy: 153.22 GWh
  • Headrace tunnel: 4635.31 m
  • Power Evacuation to: Gojra Substation (Approx. 12 km from Powerhouse)
Project Brief

Located at a distance of 700 Km northeast of Kathmandu, Siwa Khola Hydropower project is proposed in Siwa river in Taplejung District of eastern Nepal. The project shall utilize the design discharge of 5.49 m3/s to generate 26.86 MW of electricity. The project is accessible through a 32 km of access road from Banande Bazar located at Mechi Highway.